Hot Water Systems

Lesson 4.2

What Is a Hot Water System

A hot water heating system has three jobs: make hot water, move it, and put the heat where it is needed.

Make: The boiler burns gas (or uses electricity) to heat water to a target supply temperature.

Move: Pumps circulate water through the loop continuously. VFDs vary pump speed to maintain a target differential pressure.

Deliver: AHU and fan coil hot water valves modulate to take heat from the loop.

The sequence has two key calculations:

  1. OAT reset: Calculate the HWST setpoint from outdoor air temperature.
  2. Differential pressure control: Command the VFD to maintain the DP setpoint.
  3. Lead / lag pump logic: Two pumps: one lead, one lag (standby). The lag pump starts automatically if the lead pump fails to prove.

    Point Map

    Point Description Category
    HW_SupplyTemp Hot Water Supply Temperature AI
    OAT Outdoor Air Temperature AI
    Diff_Pressure Loop Differential Pressure AI
    Pump1_Status Pump 1 current switch proof BI
    Pump2_Status Pump 2 current switch proof BI
    VFD1_Spd Pump 1 VFD speed command 0-100% AO
    VFD2_Spd Pump 2 VFD speed command 0-100% AO
    Boiler_En Boiler enable relay BO
    Pump1_En Pump 1 enable relay BO
    Pump2_En Pump 2 enable relay BO

    Software points: Sys_Enable (BV), Rotate_Pumps (BV), HWST_SP (AV), DP_SP (AV).

    Simulator Notes

    Boiler Setpoint Signal: Scaled 0-10 VDC over 120-180 degrees F. The boiler reads this voltage and sets its firing target accordingly.

    OAT Reset: OAT <= 20 degrees F results in HWST-SP max 180 degrees F. OAT >= 60 degrees F results in HWST-SP min 140 degrees F.

    Pump Rotation: The incoming pump starts and proves first. Both pumps run briefly in parallel to prevent flow interruption. Once proof closes, the outgoing pump shuts down.